德国西门子LDU11.523A27燃气检漏控制器

发布日期 :2013-11-23 12:05 编号:1968310 发布IP:112.95.18.51
供货厂家
深圳市宝安区石岩天达涂装设备配销售部
报价
电议
库存
100 个
联系人
雷 前程(先生)
电话
0755-29722030
手机
13590142700
询价邮件
280760173@qq.com
区域
深圳安全防护用品加工
地址
光明新区公明镇世峰大厦
让卖家联系我
详细介绍
手机版链接:https://m.trustexporter.com/cz1968310.htm
LDU11燃气检漏控制器(SIEMENS) 详细信息
德国进口控制器 西门子控制器 SIEMENS控制器 程序控制器价格 控制器技术参数 控制器批发 燃烧器控制器 控制器详细信息 西门子程序控制器 燃烧器配件


产品说明:
The LDU11... control detects leakage of the shut-off valves on gas trains with two safety shutoff valves. During each burner cycle, the LDU control unit automatically sequences, and if a leak is detected, initiates a lockout and prevents the burner from starting up.
Performs leak test of the gas shut-off valves before start-up and/or immediately after burner shut-down
No inlet gas pressure limitations
Easy-to-read dial indicates progress of test program
Ability to eliminate or leak test the vent valve
Cost effective control improves system safety
Globally Approved ?cULus, FM, CE
The LDU11 (or control unit) is used in a gas-fired combustion system with or without a vent valve in the gas train.
Installed with one or two pressure switches mounted between the gas valves, the LDU automatically initiates gas valve proving either
prior to burner start-up
immediately after the controlled shutdown, or
both prior to burner start-up and immediately after shutdown
The valve leak test is completed in two stages:
First test phase Test1, evacuates the pressure between the gas valves to test the upstream gas shutoff valve. The pipe between the gas valves is monitored by a leak detect pressure switch for no increase in pressure.
Second test phase Test2, pressurizes the area between the gas valves to test the downstream safety shutoff valve. The pipe between the gas valves is monitored by the leak detect pressure switch for no decrease in pressure.
If the leak detect switch signals excessive gas pressure increase during the first test phase Test1, or decrease during the second test phase Test2, the LDU control will lockout and prevent burner start-up. The indicator dial on the front of the unit indicates the progress of the leak test. When a fault occurs, the indicator dial stops at the time of lockout, and indicates
我们的其他产品
您可能喜欢
德国西门子德国西门子控制器
 
相关德国西门子产品